8700563781
info@gpsgroupindia.com

C-86 BPTP Astaire Garden

C-86 BPTP Astaire Garden

Sector 70A , 122001

Property Details

560 Sq. Yards

Second floor

Covered Parking

4BHK

3 Bathrooms

3 Bedrooms

3 Balcony

Property Description

Property Description

GPS Group presents 3BHK builder floor for sale at attractive price with covered car parking, lift, outdoor gym and jogging track in a group housing building unit. Fully loaded floor with modular kitchen, wood work done in all bedrooms, italian flooring and overall great construction quality. Gps group has successfully delivered more than 20 floors in last 3 years in Gurgaon. The building has full power backup. It is walking distance to Santuary Club and St Angel's Global School. 5 minute drive from 3 Roads Mall and Southern Peripheral Road, 15 minute drive from NH8.

Location highlights

  • Astaire Gardens is a luxurious township in Gurugram that enjoys excellent connectivity through NH-8, Sohna Road and the Golf Course Extension Road.

  • Spread over 102.2 acres, this township will provide its residents with unmatched comfort in terms of design, layout and amenities.

  • A 2 Acre park that resembles a resort.

  • 24 Meter black-top approach road from SPR.

  • The township will have 100 % power back-up, 24x7 civic facilities and perimeter security.

  • A self-contained township, Astaire Gardens will feature education centers, health care facilities and all modern amenities to ensure absolute comfort for its residents.

 Additional details :

  • The property will have a dedicated security guard.
  • There is a lift to make the living more convenient specially for old age people
  • You can easily park your car inside the compound.
  • Each apartment comes with a jaccuzzi in the master bedroom.
  • A beautiful terrace common to all to gather and entertain.
  • Full power backup available.
  • The kitchen has been built with modular fittings.

Construction Images


Floor Plans


Amenities

Reserve Parking

Visitor Parking

24*7 Power Back-Up

Lift

Club

24*7 Security

Gym

Parks

24*7 Water

Kids Play Area

Maintenance Staff Builder Floors

Jogging Track

Schedule Of Payment

Construction Linked Plan

At the time of booking 5%
Within 15 days 5%
On Start of Construction 5%
On Casting of DPC 10%
On Casting of Stilt/Ground Floor Roof 10%
On Casting of First Floor Roof 10%
On Casting of Second Floor Roof 10%
On Casting of Third Floor Roof 10%
On Completion of Internal Brick Work 10%
On Completion of Internal Plaster 10%
On Start of Internal Flooring 10%
At the time of Offer of Possession 5% + other Charges

Down Payment Plan

(Discount of 3% on the basic cost will be offered)

At the time of booking 10%
Within 30 days of Booking 85% + PLC(if applicable)
At the time of Offer of Possession 5% + other Charges
The installments listed here in above shall became payable on demand irrespective of the order in which they appear.